After the deployment of TBCOM 400G modules, the stable operation rate of the data center reaches 99.999%, meeting the financial-grade 99.99% reliability requirement and completely solving the problems of packet loss and delay during peak hours. The power consumption of a single module is reduced to 9W, saving 20% energy and effectively reducing the PUE and energy consumption costs of the computer room. 100% factory pass rate, ultra-low repair rate and multi-vendor compatibility greatly reduce the operation and maintenance pressure and ensure continuous and efficient business operation.
99.999%
Stable operating rate
40%↓
Overall cost reduction